{"id":1261,"date":"2025-11-30T12:13:45","date_gmt":"2025-11-30T11:13:45","guid":{"rendered":"https:\/\/www.abmv.cz\/sluzba\/tenant-coordination\/"},"modified":"2026-06-10T13:24:14","modified_gmt":"2026-06-10T11:24:14","slug":"tenant-coordination","status":"publish","type":"sluzba","link":"https:\/\/www.abmv.cz\/en\/sluzba\/tenant-coordination\/","title":{"rendered":"TENANT COORDINATION"},"excerpt":{"rendered":"<p>The ABMV Approach At ABMV, we provide complete tenant coordination from the initial requirements through to the handover of the premises to the new tenant. We set clear rules, unified documentation formats, and transparent processes to ensure that tenant requirements are aligned in time with the design, construction schedule, and operational limits of the building.&hellip;<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false},"categories":[],"class_list":["post-1261","sluzba","type-sluzba","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/sluzba\/1261","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/sluzba"}],"about":[{"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/types\/sluzba"}],"version-history":[{"count":3,"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/sluzba\/1261\/revisions"}],"predecessor-version":[{"id":1367,"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/sluzba\/1261\/revisions\/1367"}],"wp:attachment":[{"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/media?parent=1261"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/categories?post=1261"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}