{"id":1282,"date":"2025-11-28T17:48:00","date_gmt":"2025-11-28T16:48:00","guid":{"rendered":"https:\/\/www.abmv.cz\/?post_type=sluzba&#038;p=1282"},"modified":"2026-06-10T13:23:34","modified_gmt":"2026-06-10T11:23:34","slug":"bim","status":"publish","type":"sluzba","link":"https:\/\/www.abmv.cz\/en\/sluzba\/bim\/","title":{"rendered":"BIM"},"excerpt":{"rendered":"<p>The ABMV Approach At ABMV, BIM means more than a 3D model. We treat it as building information management &#8211; connecting data, models, and reporting into one functional system. To keep the BIM model truly usable during construction, we work in a controlled Common Data Environment (CDE)where changes, revisions, and handovers are tracked with a&hellip;<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false},"categories":[],"class_list":["post-1282","sluzba","type-sluzba","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/sluzba\/1282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/sluzba"}],"about":[{"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/types\/sluzba"}],"version-history":[{"count":4,"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/sluzba\/1282\/revisions"}],"predecessor-version":[{"id":1352,"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/sluzba\/1282\/revisions\/1352"}],"wp:attachment":[{"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/media?parent=1282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.abmv.cz\/en\/wp-json\/wp\/v2\/categories?post=1282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}