The ABMV Approach
At ABMV, we provide end-to-end permitting and approvals management for construction projects of various sizes and typologies. From the initial concept through occupancy approval and commissioning, we manage deadlines, completeness of submissions, and coordinated communication with public authorities and statutory stakeholders (DOSS).
Our goal is a permitting package prepared systematically and transparently—so the process runs smoothly, without unnecessary returns, delays, or repeated requests for additional information.
What We Do
- EIA – Environmental Impact Assessment
- We coordinate all required documentation and statements from relevant parties, and maintain clear tracking of comments and EIA document versions.
- We manage key process steps—including the public hearing and follow-up updates—so subsequent project phases can proceed without avoidable delays.
- Building Permit (SP)
- We check the Permit Documentation (DPZ) for compliance with application requirements and authority templates.
- We compile mandatory annexes such as protocols, expert assessments, fire safety reports, and H&S documentation (from a process and submission perspective).
- The service also includes preparation of files for the Builder’s Portal (Portál stavebníka) and checks of formats, file sizes, and folder/file structure prior to electronic submission.
- Occupancy Permit / Change of Use
- We compile inspection reports, tests, and protocols, and maintain a clear log of defects and outstanding items (A-list).
- We prepare handover documentation for HOTO (handover and takeover), including minutes and supporting annexes required to start legal use of the building.
- Occupancy Approval / Final Inspection
- We coordinate the final inspection and communication with the relevant authorities.
- We deliver a complete handover package including as-built documentation (DSPS), inspection reports, testing protocols, and operating manuals.
- We work with the D-14 checklist and close the process with a structured final handover.
Key Benefits
- Permits without unnecessary returns – Systematic annex checks, checklist-based workflows, and standardised formats (incl. PDF/A) significantly reduce the risk of applications being returned.
- Version control and audit trail – All documents, changes, and addenda are tracked in the CDE and are fully traceable at any time.
- Clear permitting schedule – Defined milestones, responsibilities (RACI), and step dependencies help prevent avoidable delays.
- Centralised records of annexes and communication – One overview of all statements and approvals from authorities (DOSS) and utility network administrators, including deadlines and responses.
- Ready for the Builder’s Portal – Correct formats, sizes, and file structure aligned with electronic submission requirements.
- Experience with complex projects – From SEA/EIA processes to building permits and occupancy approvals across different project scales.
- An expert team of engineers and project managers – Professionals who understand both regulatory requirements and real construction delivery.
Why ABMV
At ABMV, we don’t treat permitting as a box-ticking exercise. We see it as a strategic part of project delivery.
- Lifecycle understanding – We manage permitting in direct connection with architecture, BIM, construction delivery, and handover—so downstream phases don’t run into dead ends.
- Process management over improvisation – Schedules, checklists, and control gates reduce random errors and unnecessary returns.
- One source of truth (CDE) – Documentation, communication, and changes are version-controlled and traceable in one environment.
- Proven track record on demanding projects – Experience where EIA, multiple authorities, technically complex documentation, and tight deadlines meet.
- We speak the language of both authorities and investors – We translate technical inputs into clear, permitting-ready submissions—without avoidable misunderstandings.
Contact Us
Do you need your project to pass through the permitting process without unnecessary returns and delays? We will help prepare the documentation, manage deadlines, and coordinate communication with the authorities to keep the process smooth and predictable.
Contact us to schedule a consultation for your project.
FAQ
We typically need the core project documentation (a feasibility study or DPZ), a list of parcels and owners, and any available statements/approvals you already have. If parts of the documentation are missing, we will help identify what needs to be completed—and in what order—to keep the process moving efficiently.